Plan automation projects from problem definition through acceptance.
Use this hub to move through the major automation purchasing and implementation decisions before committing to equipment, suppliers, or project scope.
Move from production need to a better-defined project.
These guides cover the key decisions between problem definition, supplier selection, project cost, implementation, and final acceptance.
GDE-01How to Automate a Production LineProcess / Target / Integrate→
GDE-02How to Choose an Automation IntegratorCapability / Support / Fit→
GDE-03Automation RFQ GuideScope / Performance / Acceptance→
GDE-04Automation ROIBenefit / Payback / Risk→
GDE-05Automation CostsEquipment / Engineering / Lifecycle→
GDE-06New Equipment vs RetrofitCondition / Capacity / Risk→
GDE-07Automation Project PlanningDesign / Test / Commission→
GDE-08Supplier QualificationCapability / Quality / Support→
Define, compare, implement, verify.
The guide set follows the progression from understanding the production problem to validating the installed system in measurable production terms.
STEP-01Define
Map the process, constraints, product range, cycle requirements, quality checks, and operating risks.
STEP-02Source
Build the RFQ, identify qualified suppliers, and compare capability against the same scope.
STEP-03Implement
Control requirements, design reviews, testing, installation, commissioning, and training through clear project gates.
STEP-04Verify
Confirm cycle rate, quality, recovery, changeover, uptime, documentation, and support after launch.